inspection lead

来源:学生作业帮助网 编辑:作业帮 时间:2024/04/29 23:07:05
inspection lead

inspection lead
inspection lead

inspection lead
检验周期

检查交货时间

检验的前置时间
短语
Receiving and Inspection Lead Time
验收与检验的前置时间
希望能采纳,谢谢了

检验前置时间
制造过程中进行各种检验的所需时间和日数。一般是采购前置时间和外包前置时间的构成要素之一,从供应商处交货的,已经受理的采购品和外包品的收货检验时间。但是,不是所有的采购品和外包品都会设定检验前置时间。所谓的“无需验货”的物品不需要考虑检验前置时间。
Inspection Lead Time
It means the hours and days necessa...

全部展开

检验前置时间
制造过程中进行各种检验的所需时间和日数。一般是采购前置时间和外包前置时间的构成要素之一,从供应商处交货的,已经受理的采购品和外包品的收货检验时间。但是,不是所有的采购品和外包品都会设定检验前置时间。所谓的“无需验货”的物品不需要考虑检验前置时间。
Inspection Lead Time
It means the hours and days necessary for various inspections made in the manufacturing process. Generally speaking, it is a constituent element of Purchased Lead Time or Subcontract Lead Time, and refers to the time taken to make the Acceptance Inspection for purchased parts or subcontract goods after they are delivered from suppliers and their receiving procedures are done. However the Inspection Lead Time of all purchased and subcontract goods is not set, and in other words, it is unnecessary to consider the Inspection Lead Time for goods with no inspection necessary.
注:前置时间(Lead Time),也称前置期、备货周期 。
  前置时间(Lead time)是供应链管理中的一个术语,是指从采购方开始下单订购到供应商交货所间隔的时间,通常以天数或小时计算。

收起